Human Factors Integration Plan
Plan how human factors will be managed on your project, so the right activities happen at the right time.
A human factors integration plan (HFIP) sets out how a project will identify and manage human factors throughout its lifecycle, from concept and requirements to design, commissioning and operation.
It is the foundation of human factors integration on a major project. Without a plan, human factors work tends to happen late, when problems are found in testing or at handover and are expensive to fix. With one, the right human factors activities happen at the right stage, and their results feed directly into design decisions.
Many clients and standards expect an HFIP on major projects. In Australian rail, for example, AS 7470 sets out requirements for human factors integration in engineering design, and human-centred design standards such as ISO 9241-210 describe the activities a plan should cover.
What a human factors integration plan covers
- Scope and objectives: the system, the people who will use, operate and maintain it, and what the human factors program needs to achieve
- Standards and requirements: the human factors and accessibility standards that apply, and how human factors requirements will be developed and traced
- Activities by project phase: for example user research, task analysis, workload analysis, design reviews and user trials, and when each will happen
- Roles and interfaces: who is responsible for human factors, and how the work connects with engineering, safety, operations and training
- Issues management: how human factors issues and risks are recorded and tracked to closure, usually in a human factors issues log or the project hazard log
- Verification and evidence: how the project will show that each human factors requirement has been met, as part of human factors assurance
- Deliverables and schedule: the human factors outputs, and when they are due
When to prepare one
An HFIP is most valuable when it is written early, ideally at concept or tender stage, so human factors activities are planned and budgeted from the start. It should then be treated as a living document, updated as the design matures and the project moves from one phase to the next.
How we can help
SystemiQ prepares and reviews human factors integration plans, and delivers the activities in them, working within your systems engineering framework. Our consultants have supported major rail, airport, ticketing and infrastructure projects through design, assurance and operational readiness.
Contact SystemiQ
Contact SystemiQ to discuss a human factors integration plan for your project, or support to deliver one.
Prefer to phone or email? See our Contact us page.